1A targeted engagement
Consulting
Deciding before all the facts are in
The goal: keep your sites, your teams and your critical suppliers running when several risks combine.
I help companies, from large corporations to small and mid-market industrial companies, with climate adaptation: building more resilient operations, from their own sites to their critical suppliers.
Climate risks often combine with the company’s other risks: I help you decide which actions come first, where, and why.
A pragmatic, hands-on approach, built with your teams and judged by its lasting impact.
At a glance
Half of France’s 40 largest listed companies
supported on climate adaptation, with my corporate consulting team at AXA Climate
10 years as general manager, 7 years as CFO
in industrial subsidiaries and mid-market companies
Mines Paris · HEC Paris · Cambridge CISL
engineer by training, lecturer at HEC Paris; IFA–Sciences Po corporate director certificate (in progress)
1The pressures you face
You call me when…
- A site has been hit, and your board of directors asks what is planned for the others.
- Your insurer is asking questions about your sites, or tightening its terms.
- An investment will commit a site for twenty years, on exposed land.
- Your business continuity plan has never been tested against a flood, a heat wave or a drought.
- Several departments track your risks, and no one connects them.
2Three ways to work together
I usually start with a targeted engagement, tailored to answer a specific question. If you then want implementation over time, I become your fractional Chief Resilience Officer for the duration of the rollout. Digital tools extend either one.
2Over time
Fractional Chief Resilience Officer
3A tool
Decision-support tools to scale up
I design digital decision-support tools and integrate them into your IT systems. AI is built in from the start; what makes it reliable is the judgment of a former executive, which I build into its business rules and reference sources.
For example: a tool that ranks your sites by exposure and vulnerability, updated by your teams and linked to your capital plan.
From specifications to rollout, always with your IT teams. I am not a vendor: the tool remains yours.
1More on targeted engagements
The six engagements
| Engagement | What you get | Typical duration |
|---|---|---|
| Adaptation strategy for a site or a group | A prioritized action plan, site by site, with owners and budgets, built on the ground with your teams | 4 to 10 weeks, depending on the number of stakeholders |
| Risk mapping | Risk mapping that fits into your ERM program: each major risk, climate included, tied to a decision, an owner, an indicator; benchmarking against your peers | 4 to 10 weeks |
| Governance review on climate adaptation | The gaps that matter and prioritized recommendations, presented to the leadership team or the board | 2 to 4 weeks |
| Prioritization method | A shared method for deciding which sites, assets and projects to address first, handed over to your teams | 2 to 4 weeks |
| Business continuity plan test and tabletop exercise | A two- to four-hour exercise with senior management, on risks that strike at the same time; a written after-action review, with the corrections to make | 2 to 4 weeks |
| Leadership team or board decision workshop | Your acceptable risk decided, and who owns it | One or two sessions |
Each targeted engagement can stand alone, or serve as a first step toward the fractional Chief Resilience Officer role, which carries them forward over time.
To raise awareness among your leadership team or your directors: see the Training workshops.
For local authorities
Territorial adaptation, through the dialogue between companies and local authorities: the adaptation component of French local climate plans (PCAET), and workshops bringing together elected officials, local government staff and businesses.
2More on the Chief Resilience Officer role
What the Chief Resilience Officer does
- Make your risk mapping useful for decisions: each major risk tied to a decision, an owner, an indicator.
- Make your acceptable risk explicit, and prepare the trade-offs: with the leadership team and the audit committee; options compared, residual risks, deferred decisions.
- Build the resilience plan, and embed it in your processes: prevention, continuity, insurance; capital spending, procurement, maintenance. No new bureaucracy.
- Test, and get people working together: tabletop exercises, business continuity plan tests, after-action reviews; your departments, your insurers and your critical suppliers.
- Hand over and sustain: train your teams and your internal lead, document the methods, so that the actions taken hold over time, without depending on me.
How an engagement unfolds
| Phase | What happens | Duration |
|---|---|---|
| Set up | Scoping with senior management; review of the risk mapping, insurance program, business continuity plan and workplace risk assessment; visits to priority sites; first roadmap | About three months |
| Lead | Preparing trade-offs, tracking indicators, tabletop exercises, dialogue with insurers, leadership team and audit committee reviews | The core of the engagement |
| Hand over | The internal lead takes on more responsibility, methods are documented, reviews become less frequent | The final months |
What it takes to work
An engagement letter signed by the CEO. A leadership team member who sponsors the topic. Regular access to the leadership team and, for major trade-offs, to the audit committee. A designated internal lead.
Without these conditions, an outside executive is just a consultant with a title. I would rather say so up front.
One point of contact, a network of experts
I lead every engagement personally. When the subject requires it, I bring in senior experts from my network, at the right level and the right cost, and I remain your single point of contact: I act as the integrator of expertise.
Depending on the engagement, I work with specialist partners: business continuity; environment, health and safety (EHS); sustainability reporting; supply chain; adaptation financing.
3My approach: pragmatic, judged by its lasting impact
Start from the decision
Every engagement starts with one question: which decision is this work meant to inform, and who will own it?
Draw on collective know-how
Who I bring together
- At headquarters
- senior management, risk, sustainability, finance, HR, operations, strategy, and the regional managers who link headquarters and sites.
- On site
- plant manager, EHS, maintenance, facilities, operators.
On each site, I bring together people who don’t always talk to each other: operators, maintenance, facilities, supervisors. I ask them all the same question about vulnerability: someone usually has the answer, often among those with the longest memory of the site.
Comparing their views often reveals the vulnerability no one had seen alone: operators see what fails at their workstation, the facilities team knows how the building was put up.
Transfer the know-how
Documented methods, your teams involved, no dependence on the consultant.
Measure the impact
From the start, every engagement sets out its lasting impact, what will have changed by the end: a decision made, a plan funded, an exercise passed.
In the field
Heat wave
When fire protection becomes the loss
A warehouse under a metal roof, during several days of intense heat. The temperature under the roof reaches the sprinkler activation threshold, with no fire at all: the water damages the inventory.
Then the system stays out of service for several days, while the heat goes on.
What I take from it: it could not be predicted; it could be anticipated. Build climate adaptation fully into business continuity planning, in causes, consequences and cascading failures, as is done for Natech risk (industrial accidents triggered by natural hazards).
Flood
Levees everyone thought were sound
During the adaptation audit of a site in a major French city, the executive in charge was convinced that levees protected it from a major flood.
A simple check showed that these levees, managed by the local authority, were in poor condition and needed several years of work.
What I take from it: the main risk was that false sense of protection. Risk has to be assessed with local stakeholders, not only inside the fence line.
Extreme rainfall
Building for tomorrow’s climate
At the industrial sites of one of France’s largest groups, we recommended sizing critical installations for the extreme rainfall expected in the coming decades, and had it written into the standards for future major renovations.
This is what I call “Adaptation by Design.”
What I take from it: an underground stormwater system cannot be replaced once the site is built. The decision is made at the design stage.
4What I don’t do, and your questions
Frequently asked questions
How is this different from a Chief Risk Officer?
In banks and insurance companies, the Chief Risk Officer holds a regulatory role. In other companies, the head of risk covers all risks: risk mapping, often internal control and insurance.
The Chief Resilience Officer starts from a different question: how the company keeps running when several risks materialize at once. The two roles complement each other.
Why not hire someone?
Sometimes that is the right answer, and I will tell you. In a small or mid-market company, a full-time role at this level is hard to justify. In a large corporation, I can shape the role before you hire for it.
We already have a risk manager.
Good: I work with them, not in their place. I connect their analyses to decisions and get those decisions made at the right level. I can also help them, on a one-off or ongoing basis, build resilience into their role.
Where do we start if we’re unsure?
With a targeted engagement, often an adaptation strategy for a priority site or a governance review. It is the best way to check together that the role fits your needs.
Do you work alone?
I lead every engagement personally. When the subject requires it, I bring in experts I choose for their field experience. You are always kept informed.
Can you also sit on our board?
Yes, provided any conflicts of interest are disclosed and addressed by the board of directors or supervisory board, which then assesses whether I can be considered independent under the French corporate governance codes (AFEP-MEDEF, Middlenext). See the Governance page.
How much does it cost?
Each engagement is quoted at a fixed fee, after an initial no-obligation call.
An exposed, vulnerable site, a business continuity plan to put to the test, a decision to make? Let’s talk.
Schedule a video call (opens in a new tab)